Hello Cognoise,
I'm tasked to create an Active report. We are on 10.1.1 version of Cognos.
I've to call a stored procedure (sql server) from the Report studio (pass-through SQL). The proc has two parameters out of which one of the parameter (date) is o...
I'm tasked to create an Active report. We are on 10.1.1 version of Cognos.
I've to call a stored procedure (sql server) from the Report studio (pass-through SQL). The proc has two parameters out of which one of the parameter (date) is o...