I have a report that requires summary lines by branch
the weighted average calculation is:
1. ([Account Instrument Current Int Rate]*[Note Ledger Balance]) as Account WAR
2. final calculation on report is: [Account WAR] / [Note Ledger Balance]
I get ...
the weighted average calculation is:
1. ([Account Instrument Current Int Rate]*[Note Ledger Balance]) as Account WAR
2. final calculation on report is: [Account WAR] / [Note Ledger Balance]
I get ...